Flooding at Lubigi bridge paralyses Kampala-Hoima road traffic as youths cash in

Updated by Faith Barbara N Ruhinda at 1630 EAT on Monday 16 November 2026

Heavy flooding at Lubigi Bridge on Monday brought traffic along the busy Kampala-Hoima Road to a standstill, leaving hundreds of motorists stranded on either side of the submerged crossing.

The flooding followed an early morning downpour, leaving motorists travelling between Kampala, Wakiso, Nansana and Nabweru struggling to cross as rising water levels cut off movement along the major transport corridor.

Traffic congestion stretched for several kilometres on both sides of the bridge, forcing many drivers to park along the roadside as they waited for the water levels to recede.

With vehicles unable to cross, some youths in Lubigi seized the opportunity to make money by carrying stranded pedestrians across the flooded section on their backs and shoulders for a fee.

.Those seeking the service were mainly elderly people, women and other commuters who feared wading through the deep, fast-moving water on foot.

Advert.
Advert.

Ben Kato, a mechanic based in Lubigi, said he had temporarily abandoned his garage to earn money by helping pedestrians cross the flooded section.

He said he started the makeshift business at about 6:00am and had already earned approximately Shs30,000 by charging Shs1,000 per person, while larger individuals paid Shs2,000.

“We have experienced flooding here before, but nothing like this. Several people, mostly boda boda riders who insist on crossing while riding, have been falling into the water. We are making money, but we are also helping to ease traffic congestion,” Kato said.

His colleague, Moses Waiswa, said the flooding had provided an unexpected source of income after they were evicted from their vending spots along the Northern Bypass.

“We used to sell merchandise here, but KCCA evicted us. This has now become our means of survival. Whenever it rains heavily, we are assured of making some money,” Waiswa said.

Joseph Musoke, a market vendor in Kasubi who was on his way to work, was among the commuters ferried across the flooded section. He called on the government to intervene by redesigning the bridge to address the recurring flooding.

Advert.
Advert.

“The bridge was supposed to be constructed, but it is now down, yet the flooding is severe and dangerous. The people who designed the Lubigi Bridge should be arrested by Minister Balaam [Baruhagara] because we are severely affected whenever it rains,” Musoke said.

Jonathan Tusingwire, a taxi driver operating along Hoima Road, said motorists had been stranded since 8:00am, with no clear indication of when traffic would resume.

“We are waiting to see whether the water levels will subside so that we can cross. Otherwise, attempting to drive through the flooded section risks damaging the vehicle and causing financial losses,” Tusingwire said.

Wakiso district leaders, including Nansana Municipality MP Zambali Burasio Mukasa, have blamed the recurring flooding at Lubigi on poor wetland management, selective enforcement of environmental regulations and alleged allocation of land within the wetland.

District engineers, led by Samuel Mwesigya, have called on the Ministry of Works and Transport to redesign Lubigi Bridge along the Kampala-Hoima Road to increase its capacity to handle larger volumes of water.

They have also recommended replacing narrow drainage channels along major transport corridors with wider box culverts to improve water flow and minimise flooding.

The latest incident has once again highlighted the vulnerability of the Kampala-Hoima Road to flooding, with motorists and commuters repeatedly facing disruptions whenever heavy rains hit the area.

-Observer

Invest or Donate towards HICGI New Agency Global Media Establishment – Watch video here

Email: editorial@hicginewsagency.com TalkBusiness@hicginewsagency.com WhatsApp +256713137566

Follow us on all social media, type “HICGI News Agency” .

Leave a Reply